|
"The pieces are fabricated and joined with the aft pressure bulkhead at Boeing’s North Charleston, S.C. plant and then delivered for final assembly to the company’s nearby final assembly building or flown to Everett, Wash." Not the first time quality control has been an issue at the N.C. plant. From a New York Times article back in 2019:
"Ever since, Qatar has bought only Dreamliners built in Everett." [0] [0] https://www.nytimes.com/2019/04/20/business/boeing-dreamline... |
"We have a manager that will physically watch us while we're working on the jet and watch us as we go to the bathroom," he says. "I'm a 40-year-old military veteran and I have a 20-something-year-old manager asking me why I use time to use the bathroom."
https://psmag.com/economics/a-tale-of-two-boeing-factories