|
|
|
|
|
by classicsnoot
4080 days ago
|
|
In my limited experience [1 windmill that i am currently working on] the biggest issue we are facing is lightning strike. The windmill is located on a small island .6 miles off of the coast of Maine. the structure rises 20+ feet over the tops of the trees. The Seawind is pretty consistent so wind seemed like a good idea, but the first strike fried the innards of the turbine and compromised the lines running to the battery array [the system uses a ruggedized Ranger power management computer to charge the batteries (28 inline 1.5 amp boat batteries) from either the windmill or the diesel generator]. I know very little about all of this, but it has been left to me to get it working. The system only has to power 110v outlets [30+], a water pumping system [well pump + distro pump], and a washer and dryer. As it stands we run the Genny for ~6 hours then use the batteries for ~18 hours. The island is only inhabited for ~2 months all year, but it is still expensive and dirty. The Island is conifers rooted in primeval moss on top of pink granite. there is little to no dirt, and i have limited access to TNT and my biggest rock drill bit only goes down 2 feet, so the grounding system (which i think is where the fault in the system is) is my biggest concern. As of now, i am going to attempt to use a surface, chemical grounding system, but, again, i don't really know what i am doing so it is pin the tail on the donkey with my hands tied behind my back. If anyone has experience with windmills and/or grounding i could desperately use some advice... |
|
Grounding on hard rock is tough. There are methods for measuring ground conductivity, and in a situation like that, you'll need them.