|
|
|
|
|
by HarryHirsch
4442 days ago
|
|
They'll still need to verify all systems and components before a second launch That. You need to re-qualify the engine after each launch. The cost of labour far exceeds the cost of materials, you need to strip and re-build the thing, and you ask yourself just how much money you can save through re-using the first stage. I don't think it's much. |
|
But the Merlin engines have been designed from the start to be reusable and dependably reignitable, whether at sea level or upper atmosphere. They're pretty amazing-- essentially the pinnacle of +50 years of engine design. Tom Mueller is a huge badass. :) http://en.wikipedia.org/wiki/Merlin_(rocket_engine)
And check out that bad boy roar: http://www.youtube.com/watch?v=wkdReoxGHG8
I don't have a link on hand, but Elon has said multiple times that the majority cost of the Falcon-9 is the raw material. One of the reasons they've been able to drop the price significantly is by using more efficient manufacturing techniques, requiring less material and creating less waste. (e.g. stir-friction welding)
It's also worth noting that Falcon-9 can still complete a mission with one (and perhaps two?) engine failures, which gives quite a more comfortable margin of error. There's a big difference between "perfect" and "near perfect" when it comes to engineering these things. ;)