by Moldoteck
42 days ago
|
|
Why only 40y for new nuclear? When min license is 60 for gen3 and many gen2 already got extensions to 80y. And where did you get the 100% 24/7 number? The min profitability of FLA3 doesnt assume that. And that's for an ultimately failed project which could have been much better if not EDF incompetence |
|
And you do realize that across such a lifespan essentially the entire nuclear plant except the pressure vessel and outer shell is replaced?
Steam generators, turbines, generators, control systems, piping, valves etc. Everything is replaced. Is that free?
There’s no trouble building renewables with similar lifespans. It is just not done because predicting profitability until the 2100 is absolute lunacy.