You need to read precisely what's happening. Ontario wants to front finance all refurbs and SMRs instead of spreading the financing over years like it's usually done.
BWRX is expensive for sure. It'll cost more per GW than the failed french FLA3 or Vogtle. To me this seems a mistake considering Canada had Candus, an own authentic design that doesn't rely on enriched fuel and they did some very serious refurbs recently on time and on budget. On the other hand, bwrx is american tech and needs enriched fuel and SMRs will always have worse economics than large units, there's a reason humanity scales everything up, be it nuclear, be it wind turbines or solar fields
Again. Refurbs are extremely cheap. At 1-3bn/unit you get 1GW of firm power. That would be vastly cheaper vs deploying say solar, that would have the same TWh/y averaged even with China's costs. And this doesn't even account for firming.
Heck, even Barakah built as new by Korea is competitive vs renewables in the west. And it's understandable considering they spent per unit 1/3 of what FLA3 did cost... In under half of the time
The question is rather why they want front financing. But I have some clues considering who is their current head of govt
> The question is rather why they want front financing. But I have some clues considering who is their current head of govt
I assumed it was, like the UK, because it let them avoid committing to a specific price like all the other competing technologies so they could raise the price later once the project was too far along to cancel.
Maybe for smr, but for refurbs it doesn't make sense - all recent refurbs were either on time or ahead of planned timeline and on budget. Heck, even if refurbs would suddenly triple in price it would still be dort cheap vs any alternative for 1GW of firm power.
And they kinda committed to a price with Hitachi, that's why we can say it'll be worse even than recent failed big projects.
UK has other problems to tackle, mostly heavy overregulation. UK's HPC and french FLA3 are very different in many aspects, ranging from more concrete &steel use, up to a parallel analog system on top of a parallel digital system because UK regulation is 'special'. Maybe things will change, we'll see
To me this front financing looks like a cash grab from political entities since nobody guarantees money will be used in this direction, especially with current Ontario's 'governor', that dude is local trump equivalent but maybe a bit more tempered. Another possible reason is political - this frontload means project can't be easily cancelled if relationship with US gets even worse, since Hitachi GE is an US company. So who knows. Either way, IMO bwrx decision wasn't smart and front loading isn't smart too. But this has nothing to do with refurbs cost which are dirt cheap
I know about it, affected components were replaced. They still built it relatively on time and on budget
"On 7 February 2014, the Nuclear Safety and Security Commission declared that its investigation since mid-2013, they found eight cases out of 2,075 samples of foreign manufactured reactor components that were supplied with fake documents."
Nope. 7 years late (plan: 2017, last reactor diverged in 2024).
Total cost not known, at least 24.5 billion USD and maybe up to 32 according to Bloomberg (plan: 20). Koreans are even fighting: KHNP (a subsidiary of KEPCO, the company building the plant) officially seeks for about 1.2 billion USD in compensation ( https://www.businesskorea.co.kr/news/articleView.html?idxno=... ) and it may worsen up.
8bn/unit is successful considering fla3 was 23bn. 8y/unit is successful, several in parallel with 1y distance, considering fla3/vogtle took about 20y.
Yes. It is a success.
Korea also announced they plan to build two additional reactors domestically by 2038
I've seen what a success Energiewende was. Really top notch execution to spend more than the entire french fleet and after 25y to have much worse emissions, while planning to have 80GW gas firming per Fraunhofer ISE to cover under generation periods
> 8bn/unit is successful considering that FL3 was 23bn.
Yes, a failure is better than a disaster. As we say in France, "in the land of the blind, the one-eyed man is king."
> Korea also announced their plan.
For 25 years, numerous announcements of this kind have been made by many nations, without any real intention of following through, and for various reasons (electoral considerations, will to create competition for renewable energy suppliers, etc.).
Only projects that are actually starting (on the ground) provide a good indication.
> Energiewende
> spends more than the entire French fleet
On the one hand, France's transition to nuclear power began with the first industrial nuclear power reactor (dubbed "EDF1") in 1957. In 1959, the project for the power plant that would be completed in Chooz in 1967 began, and as early as 1964, nuclear power was presented to the public as the energy source that would take over in 1975 (correctly predicting that in Europe it would produce 25% of electricity 20 years later: https://www.youtube.com/watch?v=v6Xfu8u3Yqw).
This nuclearization lasted approximately 40 years.
Furthermore, nuclear power did not replace a huge set of existing electricity-producing sector, such as coal in Germany, because in 1970 France produced about four times less electricity than at the end of its nuclear power deployment: https://ourworldindata.org/grapher/electricity-production-by...
In short: comparing France's nuclearization with the Energiewende is extremely difficult, and a direct comparison absurd.
> planning to have 80GW of gas-fired power plants
In early 2026, Germany announced it would deploy new gas-fired power plants. The impact depends on the corresponding emissions. If they are only all active for a few hours a year to get through critical periods and (as planned) replace coal or primarily burn green hydrogen, for example, then it will be progress (reducing emissions). The best-case scenario is a full renewable fleet but Rome wasn't built...
BWRX is expensive for sure. It'll cost more per GW than the failed french FLA3 or Vogtle. To me this seems a mistake considering Canada had Candus, an own authentic design that doesn't rely on enriched fuel and they did some very serious refurbs recently on time and on budget. On the other hand, bwrx is american tech and needs enriched fuel and SMRs will always have worse economics than large units, there's a reason humanity scales everything up, be it nuclear, be it wind turbines or solar fields
Again. Refurbs are extremely cheap. At 1-3bn/unit you get 1GW of firm power. That would be vastly cheaper vs deploying say solar, that would have the same TWh/y averaged even with China's costs. And this doesn't even account for firming.
Heck, even Barakah built as new by Korea is competitive vs renewables in the west. And it's understandable considering they spent per unit 1/3 of what FLA3 did cost... In under half of the time
The question is rather why they want front financing. But I have some clues considering who is their current head of govt