It’s fairly obviously designed to avoid the issues which almost caused the cancellation of the new Edinburgh tram — spiralling costs caused by the need to move existing utilities under the deep track base. That crisis was probably as much to do with a badly formed set of contracts as with the technical issues themselves, but it’s still worth designing out. |
|
At least in the US utility relocation also generally involves moving what was underneath to the side, so it can be accessed without disrupting the new transit line.