by frosted-flakes
532 days ago
|
|
Sometimes a temporary cover is built first to minimise disruption on the surface. Here's an old example of an umbrella bridge over Oxford Circus during the construction of the Victoria Line. There's a longer video out there of the construction of the Victoria Line that covers this in more detail. https://youtu.be/9ghWdnYtp2I Some of the stations on the Broadway Subway Skytrain extension in Vancouver use a similar approach, where half the road is closed and a road deck is built, then traffic is shifted over to the new road deck while excavation takes place from the side. There's some great views of this while riding the bus. |
|
Edit: If the road deck is left in place permanently then it is a permanent elevated road deck built over a cut and cover tunnel. I can see how some people might consider this the "cover," but that is atypical in the industry and not what people are usually talking about when they say cut and cover. I'll concede that this approach sometimes happens, but I wouldn't call it "often" like GP does and I'd also note that even under this scheme the final surface/cover (e.g., the roadway) is completed after the underground excavation and structure are finished, meaning that the cut still precedes the cover.
The most common terms for this in the industry are "lid" or "cap." As in, you put the lid on, or cap, the excavation or cut and cover tunnel.