|
|
|
|
|
by abduhl
532 days ago
|
|
This is not what the cover in cut and cover refers to. This is a temporary bridge erected over a cut and cover operation. When the excavation (the "cut") and structure are completed underneath and the backfill/concrete is placed up to ground surface (the "cover") the temporary bridge will be pulled out. The "cover" part is about covering up the buried structure after it's built to put the ground surface back to where it was. Edit: If the road deck is left in place permanently then it is a permanent elevated road deck built over a cut and cover tunnel. I can see how some people might consider this the "cover," but that is atypical in the industry and not what people are usually talking about when they say cut and cover. I'll concede that this approach sometimes happens, but I wouldn't call it "often" like GP does and I'd also note that even under this scheme the final surface/cover (e.g., the roadway) is completed after the underground excavation and structure are finished, meaning that the cut still precedes the cover. The most common terms for this in the industry are "lid" or "cap." As in, you put the lid on, or cap, the excavation or cut and cover tunnel. |
|