|
|
|
|
|
by Strenuous9770
700 days ago
|
|
Lack of gradual, health mediated rollout is absolutely the core issue here. False positive signatures, crash inducing blocks, etc will always slip through testing at some % no matter how good testing is. The necessary defense in depth here is to roll out ALL changes (binaries, policies, etc) in a staggered fashion with some kind of health checks in between (did > 10% of endpoints the change went to go down and stay down right after the change was pushed?). Crowdstrike bit my company with a false positive that severely broke the entire production fleet because they pushed the change everywhere all at once instead of staggering it out. We pushed them hard in the RCA to implement staggered deployments of their changes. They sent back a 50 page document explaining why they couldn't which basically came down to "that would slow down blocks of true positives" - which is technically true but from followup conversations quite clear that is was not the real reason. The real reason is that they weren't ready to invest the engineering effort into doing this. You can stagger changes out within a reasonable timeframe - the blocks already take hours/days/weeks to come up with, taking an extra hour or two to trickle the change out gradually with some basic sanity checks between staggers is a tradeoff everyone would embrace in order to avoid the disaster we're living through today. Need a reset on their balance point of security:uptime. |
|
> Crowdstrike bit my company with a false positive that severely broke the entire production fleet because they pushed the change everywhere all at once instead of staggering it out. We pushed them hard in the RCA to implement staggered deployments of their changes. They sent back a 50 page document explaining why they couldn't which basically came down to "that would slow down blocks of true positives" - which is technically true but from followup conversations quite clear that is was not the real reason. The real reason is that they weren't ready to invest the engineering effort into doing this.