|
|
|
|
|
by filterfiber
914 days ago
|
|
> But that's not the point, obviously. If you want to say the zero2-w is what's making it then sure. > Besides, a 4090 costs more than a car. They only cost ~0.70USD for 1 hr. In fact you could put this on an A100 for 1$/hr. Renting would make the most sense for this type of thing. |
|
If there's a human in the loop, 100 images/s is likey too much volume, especially if prompt engineering is needed.
At the same time, 2 images/hr is way too slow.