|
|
|
|
|
by Sudophysics
1906 days ago
|
|
Ok, I know it sounds crazy. But what if they put a correctly sized explosive(s) deep enough below and along the spine to blow and then fill the area with water, reducing the rheological load? We're talking about 100 feet underneath the canal bed, and do it with a shaped charge that'll be more optimal for the task. Just thinking about fast <1 week methods. |
|