|
|
|
|
|
by babyrainbow
3280 days ago
|
|
How much refurbishing goes into preparing a previously used rocket before it is reused? What technological breakthrough of recent times has made this sort of quick inspection and reuse possible, that was not possible earlier? |
|
1. I'm not nearly knowledgable enough about the overall refurb process to give you an in depth answer. The best answer I could probably point you towards is this article[1] quoting our President Gwynne Shotwell. It won't give you the specifics you're looking for, but it will give you an idea of the costs in relation to a new build. Seeing as labor is a fairly large cost component of the rocket overall, this gives you some idea of the potential extent of refurbishment vs building a new rocket.
2. Even if I did have the requisite knowledge to answer your question, those kinds of internal procedures aren't something I could share. My apologies.
As to what breakthroughs make this sort of inspection and reuse possible, and I'm not saying this to be pithy, the biggest component is simply that the stage lands on a solid base rather than being dunked, or slammed into to be more accurate, highly corrosive salt water. Reusability isn't so much a function of any huge advancement in inspection so much as the ability to execute a controlled landing of the first stage. Although there are quite a few advancements in metallurgy and materials science, not to mention NDT procedures, that do increase the life span of components.
I know this probably does a very poor job of answering your questions but it's the best I can do.
[1]http://spacenews.com/spacex-gaining-substantial-cost-savings...