|
|
|
|
|
by babyrainbow
3277 days ago
|
|
> so much as the ability to execute a controlled landing of the first stage... Pardon me if I am wrong here. But it seems to me that you are suggesting that most of the damage that a rocket sustains, that makes it not fit for reuse, does not happen during the launch and re-entry, but during landing and salt water? But if that is so, why was this the case with space shuttles? > Although the Space Shuttle Main Engines (SSME) were reusable and going to be used on the SLS rocket, NASA doesn't plan to reuse them. The refurbishing and recertification costs make reuse more expensive than manufacturing new engines. https://www.quora.com/Havent-other-space-companies-thought-o... |
|
With regards to the SSME, the SSME is an engineering marvel, but it is significantly more complex than the Merlins you’ll find on Falcon, both in initial build as well as refurb. I know a few techs here who used to work on them at Rocketdyne. Raptor will be more analogous to the SSME but there have been significant advancements in metallurgy and materials science since the introduction of the SSME, which should hopefully lead to easier reuse. Also, it should be noted that the SSME were in fact refurbed and reused when they were part of the Shuttle program.
As to your quote from Quora, I find it somewhat ambiguous. Again, the SSME was routinely refurbed and reflown as part of the Shuttle Orbiter. I’m no expert on the SLS program, although I do keep up with things space related, but I’ve yet to see any cost breakdowns of refurb vs new build in regards to SSME specifically. That quote makes it unclear to me whether NASA found that reusing the SSME as part of the SLS program is cost prohibitive, or whether making the first stage of the SLS reusable, which happens to use the SSME, is cost prohibitive. It should be noted that the SSME and RS-25 are largely the same engine, and later flights of SLS will switch to a cheaper non-reusable version of the RS-25. In any case, the first stage of the SLS is going to end up in a giant pond of salt water, along with the attached SSME/RS-25s. SLS was never designed for propulsive landing, and can not be made to do so now, so those engines are ending up in the ocean no matter what. Perhaps the poster means that NASA found the refurb costs of the SSME to be prohibitive after they have been dunked in salt water, again, since this is the only possible outcome with SLS. Obviously if the first stage of SLS landed on solid ground, or a ship at sea, the refrub cost of the SSME would be completely different.