|
|
|
|
|
by netheril96
3984 days ago
|
|
The perfectionist in me thinks in another way: time is an important resource and time taken should be considered a penalty from the perfection point. That is, if you spend too much time implementing a feature "perfectly", that is not perfect in the 4D spacetime continuum. |
|
I'm a perfectionist, too, but I'm also lazy. As a result I hate the idea of working hard on some beautiful piece of code that no one ends up using.