|
|
|
|
|
by csours
4110 days ago
|
|
Huge number of features = more to go wrong. Cutting edge tech = higher risk. (can be mitigated with engineering discipline) Small production runs = less time to debug production process, which is a 2 edged sword: higher production costs and more built-in defects. |
|
Higher production costs and more built-in defects are two liabilities. A suitable alternative in this case would be a "double whammy". More on that idiom: http://english.stackexchange.com/a/132063