|
|
|
|
|
by jralphs
4282 days ago
|
|
The tech stuff has not been a bottleneck. I've spent the last 1.5 months in gyms testing the product, while my contractors have been building the tech mvp (hardware + algorithms). They'll be done in 2-3 weeks, so I need someone to take over at that point and start building the app. |
|