|
|
|
|
|
by ControlledBurn
4283 days ago
|
|
Don't have anything to link to, but you're right, everything still ends up in a 2U, technically OU (Open U, 2 inches per OU instead of 1.75), chassis. Each ODM has their own unique sled setup for the server nodes, but everything ends up in a 2OU framework for the busbar connection. |
|