|
|
|
|
|
by allegory
4307 days ago
|
|
That's exactly what was done. The guys we had were shit hot ex Microsoft admins. The DR environment was the staging environment for the patches. Periodically the production kit would be block copied back to the DR environment and sysprepped. Every step to prevent differences between the two clustered environments were taken. |
|