Using 10% for cost of capital for a construction project is ridiculous. Direct loan costs often run at around 6% but can be as low as 4%. Considering the number of Ghost city's built in China he might have access to even cheaper capital. |
|
Here is an example calculation of an infrastructure project:
http://investment.infrastructure.gov.au/publications/reports...
Also, your ghost city comment is irrelevant, which I already addressed in a prior comment.
And as a final point, even with a 6% WACC in an ideal scenario, which I addressed, the NPV is still -3.33 billion.