|
|
|
|
|
by sophacles
4800 days ago
|
|
I think "rezoning time" is the same thing as wasted time. If I have to "zone up" for a task, and that part takes me 30 mins, while once in the task it takes me 15 mins, I figure I've wasted 30 mins. As for different types of time, I fully agree. If I'm in a half hour between meetings for instance, and I can do some tweaking to simplify actions, I can claim I spent 30 mins on that, but, I can't claim I traded 30 mins of "productive" time for it. So if that 30 mins of work allows me to have a less disruptive action in a workflow, the amount of time that workflow actually saves is hard to measure, and may overall be well less than 30 mins, but who cares? Life is smoother, and it would have been 30 wasted minutes otherwise. |
|