You cannot have big storage either way. Its normal to have two installations and be able to switch between them.

Not in Poland, because you are too independent.

1 comments

The legislation was updated:

"According to the adopted act, devices with a capacity of up to 30 kWh are exempt from any construction procedures; only reporting to the grid operator (OSD) is mandatory. Those between 30 kWh and 300 kWh in a building and 30 kWh and 2000 kWh freestanding are obliged to prepare a land development plan and make fire safety arrangements."

https://renewablesnow.com/news/poland-adopts-rules-to-ease-e...