Hacker News new | ask | show | jobs
by lokar 5 days ago
The cost of the land, building, mechanical equipment, etc is a very small fraction of the total cost of a DC.
1 comments

The upfront cost of facility is ~30%, network infra 10-15%, land/utilities is small percentage, power could be significant for an AI DC. The servers are ~50-60% only.
That was not my experience, but that was pre-Covid