Hacker News new | ask | show | jobs
by mixmastamyk 22 days ago
Doesn’t matter, go to a charging station once every two weeks if/when charging gets behind. If you’re determined to fail instead of succeed there’s always more excuses to be made.

There’s a good tech connections series on this. Slow home charging has been doable for quite a while.

1 comments

It's doable for single family detached housing for users with a modest daily drive and relatively flat usage patterns so long as they can afford to pay a premium on the car and replace it in a timely fashion when the battery gets sufficiently old that its capacity continues to match peaks in usage with the understanding that failure to keep up means you don't get to work on time or can't get home.

Which is exactly why techbros think its obvious and most regular people aren't buying.

Nope, our 1970s apartment garage has 120V outlets and light fixtures, some have been tapped, and the rest could cheaply.
Most apartments especially in cities where most people live are unsuitable for charging of any kind
False, just mentioned our apartment.

For the ones that need upgrades, we’re talking extension-cord-level technology.

Suburbia has sprawling lots where nobody is near a receptacle and cities have concrete pads which aren't wired save for lighting. In the minority of cases in which there are any outlets at all nearby any assigned parking spot they are locked to prevent homeless camping their charging their stuff.

When any spots exist the electrical system would never tolerate more than a few people plugging in at once.

For instance if you picked 3 50 unit complexes you would would find that 3 cars were situated to charge out of the 200 to 300 owned.

At present like 2% of cars owned not sold are electric to get to a much higher penetration that is desirable we need better charging.

You don't live in a statistically valid sample of homes our current attachment only works now because 49 out of 50 cars run on gas.

Definitely not true in California, as I already mentioned. Approx 1/3 of cars here. Slow charging is not intensive and if the utility needs more capacity they’ll build it. Like for data centers.

Light poles are being tapped in the neighborhood for EV and surveillance already.

The great thing about the utility market is that they don’t need your permission to invest. They’ll do it when it becomes profitable, i.e. already.

Are you the same guy who poo-pooed digital photography in 2000? Sounds like it.