|
|
|
|
|
by dlcarrier
21 days ago
|
|
More often than a faulty initial design, it's because of a something not being followed, e.g. the design called for one type of material or process and another was used during construction, either on accident or on purpose but without correctly doing the math to verify that it will work. |
|