by 3eb7988a1663
24 days ago
|
|
That video is good - seeing the train-car dropping the panels into place makes it clear that you have some immediate labor savings on the initial deployment. Not sure if the post-installation labor was significant or could be automated away. Still not sold on the idea. For something with a 20+ year life span, the initial deployment effort seems kind of irrelevant and should be better located somewhere that does not require ongoing activity. Train ballast requires replacement every N years which is going to require ripping up all of those panels. |
|
Dropping panels in place is not the hard part. Getting all of that electricity back to a connection point is one of the many problems created by this idea.
Putting panels in a multiple kilometer long end-to-end row is very inefficient compared to rectangular layouts that can be clustered around connection points.