The video mentions that they did all the drilling so far at 100kW and are expecting to start doing 1 MW within the year.
I wonder what their transmission voltage is. They're talking about a 1km deep shaft. That feels like a lot of conductor to get to 1MW, unless you can send at 20kV or something high. Reciprocally though if you're not transmitting major force through a drillshaft, perhaps it still is a major net win for cost.
Figuring out heat management down there feels like it would likewise be pretty tricky! Again I wonder though how that would compare to the heat generated from drilling and how much management/circulation that requires.