|
|
|
|
|
by burnt-resistor
39 days ago
|
|
Metric shittons. A 650 MW solar plant is around $900M USD, so $100B translates into 72 GW. That would power ½ of Canada. It's cheaper to use hydro (PES) rather than batteries (BESS) at scale, and Canada already has a lot of hydro power. $50B would buy lots of PES and distribution/transmission levelizing BESS that would allow greater flexibility in generation production. |
|