|
|
|
|
|
by throw0101c
39 days ago
|
|
> That’s an extremely rosy picture not aligned with reality. "Chart 1- History of Residual Stranded Debt & Unfunded Liability of OEFC" seems to show a decreasing number: * https://www.breckenhill.com/blogg.php There is of course a lot of political history (OPC, LPC, etc) that makes the whole situation messy. > A new framework was created where this stranded debt was paid off as a forced separate line item on everyone’s bills. The Debt Retirement Charge was $0.007 or 0.7¢ per kWh. |
|
https://www.auditor.on.ca/en/content/annualreports/arreports...
A near 1 cent per kWh levy on every single kWh produced, across all sources, is a massive expense.
And that is after the maximum possible had already been extracted from the market.
Why are you so afraid of admitting that the nuclear construction in Ontario was an absolute economic shit show?