by tfourb 44 days ago
> It’s only expensive and brittle because environmentalists have choked it to death.

The only reason why "environmentalists" were able to influence the debate around nuclear is because nuclear is uneconomical and studded with actual, real problems.

Look at fossil fuels. Environmentally and in terms of public health it is way worse than nuclear (at least a current respective buildout levels). And environmentalists have campaigned against it for decades. Still, it is not only used, its use has expanded until very recently.

That is because fossil fuels were incredibly cheap (as its environmental costs have been externalized), while nuclear has been incredibly expensive, even with massive government subsidies. Fossil fuels are also very practical, while nuclear is cumbersome and comes with real security issues (terrorists and planes and such) that have nothing to do with some hippies blockading nuclear fuel transports.

"Cheap nuclear" is a pipe dream that has never been realized. Not even Chinese nuclear (no environmentalists there) is anywhere near as cheap as solar.

4 comments

> "Cheap nuclear" is a pipe dream that has never been realized. Not even Chinese nuclear (no environmentalists there) is anywhere near as cheap as solar.

In Ontario, Canada, 50% of all power comes from nuclear and costs CAD 0.12/kWh (USD 0.08/kWh); see Table 2:

* https://www.oeb.ca/sites/default/files/rpp-price-report-2025...

On the spectrum from "cheap" to expensive, where would that fall?

For many years it was actually cheaper than (methane/natural) gas:

* https://www.oeb.ca/sites/default/files/rpp-price-report-2023...

Now Ontario wants to double the electricity bills to finance its nuclear refurbs and new builds.

https://reneweconomy.com.au/ontario-utility-wants-to-double-...

Ontario's Financial Accountability Office, which reports to provincial parliament and is independent of the government, concluded that at least for the refurbs:

> * The FAO estimates that the Plan will result in nuclear generation supplying a significant proportion of Ontario electricity demand from 2016 to 2064 at an average price of $80.7/MWh in 2017 dollars. (For reference, the 2017 Nuclear Price is $69/MWh and the current price of electricity for most residential and small business ratepayers is $114.9/MWh.)

> * The Nuclear Price will be higher than the average price of $80.7/MWh during the majority of the time that the reactors are being refurbished from 2016 to 2033. Post refurbishment, ratepayers will benefit from a lower than average Nuclear Price.

> * Overall, despite near-term Nuclear Price increases, the Plan is projected to provide ratepayers with a long-term supply of relatively low-cost, low emissions electricity.

> * OPG will realize a financial return from the operation of the DNGS and PNGS. OPG is owned by the Province and any return would improve the Province’s fiscal position. There is no significant fiscal impact to the Province from the refurbishment of reactors at the BNGS as it is operated by Bruce Power, a private sector organization.

* https://fao-on.org/wp-content/uploads/2024/08/Nuclear-Refurb...

I was not able to find a similar report (pro or con) for new build, though I think the current plan with some SMRs in Ontario is dumb: if we decide on more nuclear, we should stick with big(ger) CANDU, as there's little point in small reactors in a large grid like Ontario.

Renewable programs have also cost Ontario ratepayers quite a bit of money, for not a lot of electricity generated:

* https://ospe.on.ca/advocacy/green-energy-contracts-fao-repor...

Last time Ontario built CANDU’s the utility went into bankruptcy and the taxpayers still haven’t paid off that debt.
Ontario Hydro did not go bankrupt.

It was broken up into "constituent" components in 1998, and the a lot of the nuclear plant construction financing debt didn't fit neatly into any one of them, so a separate legal entity was created: Ontario Electricity Financial Corporation (OEFC).

Ratepayers pay their electrical bills, the money goes to local utilities and entities like OPG and Hydro One, which in turn pay OEFC.

The claim that it was bankrupt was a line used by Mike Harris et co to justify privatization.

It was a government owned utility, it couldn’t go bankrupt in the traditional sense since it has taxpayer backing.

But its finances were completely underwater with no way out due to the debt from nuclear construction.

After the breakup the public were left with $38B in debt from nuclear construction. Which the subsequent nuclear company was unable to pay off, or it would of course not have been restructured.

> In Ontario, Canada, 50% of all power comes from nuclear and costs CAD 0.12/kWh (USD 0.08/kWh); see Table 2:

The website does not open for me. Are the quoted prices consumer prices including tax or wholesale prices before tax?

If it’s the latter, 8 cents is not that cheap and comparable to the average price per kWh (all sources) in Germany. In most cases in most places, the lion’s share of electricity costs is tax and infrastructure refinancing, not actual production. Levellized cost of PV+storage is well below new nuclear virtually in every deployment scenario.

> For many years it was actually cheaper than (methane/natural) gas:

Because NG is one of the most expensive ways to produce electricity, if you are not producing NG yourself locally AND don’t have to pay for environmental costs.

Germany spends 10x more than france on transmission precisely because of ren expansion. Curtailment payments are much higher too. So you are right that taxes are different - depending on your pathway, you have no choice. Germany has highest household prices in EU after ireland despite 18bn/y in EEG subsidies to lower them.
That's because the utility went bankrupt and its construction costs were absorbed onto the public debt.

Nuclear is cheap to operate. It's expensive to build and expensive to decommission. Any analysis that doesn't include those two costs is highly misleading.

> That's because the utility went bankrupt and its construction costs were absorbed onto the public debt.

Ontario Hydro did not go bankrupt.

It was broken up into "constituent" components in 1998, and the a lot of the nuclear plant construction financing debt didn't fit neatly into any one of them, so a separate legal entity was created: Ontario Electricity Financial Corporation (OEFC).

Ratepayers pay their electrical bills, the money goes to local utilities and entities like OPG and Hydro One, which in turn pay OEFC.

The claim that it was bankrupt was a line used by Mike Harris et co to justify privatization.

decomission is cheap too. All german plants are decom with operator money except soviet/experimental units. There are price breakdowns if you wish for opex https://www.kkg.ch/de/uns/geschaefts-nachhaltigkeitsberichte...
Nobody said it would be as cheap as solar. But "renewables" can't fulfill ALL power needs ALL the time.

When you actually need to generate electricity rather than gather it, what's better than nuclear?

Renewables don't need to fulfill everything all the time. If they need assistance from fossil fuels 10% of the time, that's a 90% cut in greenhouse gas emissions. The last 10% won't be the biggest issue to deal with.

So you can build expensive nuclear plants for that small fraction of the time, or you can continue to use existing fossil fuel plants for free. The difference to the carbon bottom line is small.

"Renewables don't need to fulfill everything all the time. If they need assistance from fossil fuels 10% of the time, that's a 90% cut in greenhouse gas emissions. The last 10% won't be the biggest issue to deal with." - so funny seeing environmentalists accepting parallel gas infrastructure when countries like France/Sweden don't have it.
France does have parallel gas infrastructure though. It's, funnily enough, at around 10% of their electricity supply.
> "Cheap nuclear" is a pipe dream that has never been realized. Not even Chinese nuclear (no environmentalists there) is anywhere near as cheap as solar.

France went 75% nuclear in the 1980s. If we had built all those nuclear plants back in the 1980s when France did, they would be fully depreciated by now. And we'd be having this conversation about "cheap solar" in a far more favorable position where we had avoided huge amounts of CO2 emissions for 40+ years while we waited for solar technology to improve.

This is so shortsighted. We'd still have the nuclear waste problem and - more importantly - the cost. Germany alone is facing a bill of €26B to €45B for nuclear waste management, decomissioning and cleanup. All of that goes into your electricity bill, because the government pays only 25% of it: https://www.cleanenergywire.org/factsheets/nuclear-clean-cos...
nuclear waste is not a problem. It can be made a problem if the chiefs responsible for it (BASE?BMUV) have certain political affiliation...

All german plants are decomissioned through operators money except soviet/experimental units. Operators also paid into KENFO, an autoinvesting fund about 24bn and it keeps it's value despite the state taking about 2bn/y from it for interim storage and 'searching'. Meanwhile Finland built Onkalo for 1bn...

German Greens have managed the feat of presiding over extending strip coal while closing nuclear power plants. But hey, they fought for it since the 70s, and finally won; we all lost.