These datacenters have been under construction since at least June of 2025. You can see 1 building was already up in 2025 and the land was just farmland back in 9/13/2024. So this construction has been over 1 year in the making. Does this mean its construction slop? For reference colossus xAI datacenter was up and running in less than 7 months. I couldn't tell you at what capacity but this doesn't seem like quite the same story.

Edit For a little more context xAI colossus 2 looks to be an empty warehouse on 3/10/2025. By 12/2025 they had already either filled the warehouse or they couldn't use the space because they appear to built multiple structures outside for the datacenter.

For comparison again meta already had that datacenter there for a number of years and then over 2 years added those structures. In 9 months it appears Tesla built a datacenter into an existing building and added structures.

1 comments

When I left at the start of 2025, they were already building the tent.

The difference between Meta and tesla is that meta has done it many times before and in loads of countries.