|
|
|
|
|
by knivets
6 days ago
|
|
> Software engineering. During early testing, Stripe reported that Fable 5 compressed months of engineering into days. In a 50-million-line Ruby codebase, the model performed a codebase-wide migration in a day that would otherwise have taken a whole team over two months by hand. How was it measured? How was the output of this magnitude verified over a period of couple of days? |
|