|
|
|
|
|
by Stevvo
9 days ago
|
|
ETCS level 2 can increase rail capacity by orders of magnitude without laying any new track. You can have multiple trains following each other separated by stopping distance instead of having to separate trains between trackside signals. |
|
You could get ride of the smaller train , only allowing big city to survive or decrease the commodity traffic or increase the rail network or increase the train station (more tracks allowing to overtake there, and have bigger trains) There is no easy solution otherwise it would have been done.