I looked around North Dakota and there are several that say community reported. Pretty sure those either don't exist or aren't significant in size if they do exist.
> WILLISTON, N.D. – Gov. Doug Burgum today announced the construction of one of the largest data centers in the world near Williston as North Dakota continues to emerge as a hub for high-performance computing, including cryptocurrency mining.
> The Atlas Power Data Center being built by FX Solutions Inc. is part of a $1.9 billion, multiyear project that will require more than 100 workers during the two-year construction period and create more than 30 permanent jobs, according to Richard Tabish, president of Missoula, Mont.-based FX Solutions. Atlas Power, an operator of high-density facilities serving cryptocurrency mining and high-performance computing utilizing alternative power generation, will own and operate the data center following its completion.
> ...
> The first phase of the project will consist of 16 buildings, each 350 feet long by 30 feet wide, to house tens of thousands of servers that will conduct high-performance computing using 240 megawatts of electricity. Phases 2 and 3 call for expanding to 500 megawatts and then 700 megawatts, adding additional buildings and servers.
> WILLISTON, N.D. (KFGO) – Residents west of Williston were hopeful for a few hours on Tuesday, June 20, after the Williams County Commission voted unanimously to instruct the local power co-op to shut off electricity in a portion of a local cryptocurrency mine. But Corey Seidel said he knew the effort had failed by nightfall, when the servers were still operating at their usual levels.
https://www.governor.nd.gov/news/burgum-one-worlds-largest-d...
> WILLISTON, N.D. – Gov. Doug Burgum today announced the construction of one of the largest data centers in the world near Williston as North Dakota continues to emerge as a hub for high-performance computing, including cryptocurrency mining.
> The Atlas Power Data Center being built by FX Solutions Inc. is part of a $1.9 billion, multiyear project that will require more than 100 workers during the two-year construction period and create more than 30 permanent jobs, according to Richard Tabish, president of Missoula, Mont.-based FX Solutions. Atlas Power, an operator of high-density facilities serving cryptocurrency mining and high-performance computing utilizing alternative power generation, will own and operate the data center following its completion.
> ...
> The first phase of the project will consist of 16 buildings, each 350 feet long by 30 feet wide, to house tens of thousands of servers that will conduct high-performance computing using 240 megawatts of electricity. Phases 2 and 3 call for expanding to 500 megawatts and then 700 megawatts, adding additional buildings and servers.
And later...
https://kfgo.com/2023/06/25/williams-co-residents-frustrated...
> WILLISTON, N.D. (KFGO) – Residents west of Williston were hopeful for a few hours on Tuesday, June 20, after the Williams County Commission voted unanimously to instruct the local power co-op to shut off electricity in a portion of a local cryptocurrency mine. But Corey Seidel said he knew the effort had failed by nightfall, when the servers were still operating at their usual levels.