|
|
|
|
|
by NBenkovich
28 days ago
|
|
Decomposition is definitely needed as tasks become more complicated. I’d prefer to define the desired state, get a decomposed breakdown of the gap between the current and desired states, and let agents figure out how to close it themselves, rather than manually operating each intermediate task. As a project owner, I’d love to work at the desired-state level. |
|