|
|
|
|
|
by youngtaff
24 days ago
|
|
When we moved in I had my house re-roofed to add insulation and a breathable membrane Took a day to take all the tiles off the front, add insulation, membrane and batten it. Then another half day or so to put the original tiles back on Back took slightly longer because we had some alterations done but it was just over a week in total effort |
|
In some areas when big enough hail or storms goes through a town 1 or 2 crews will jump on the insurance payouts and take the low bid if they can do them all at once. And within a week or two at worst the entire neighborhood or small town is reshingled.