|
|
|
|
|
by quickthrowman
80 days ago
|
|
> If a 100MW PV farm and a data center are separated by 1km (20 Olympic pools) - is there a way to avoid AC? Not in any economical sort of way. A rectifier and two transformers is cheaper than directly switching HVDC. If you step up the voltage to 115kV, a 100MW three-phase AC circuit is only 500 amps. |
|