by squirtle24
75 days ago
|
|
I guess everyone has their own system that works for them, though I feel like this is bit over engineering. Also having to peel tiny stickers adds friction to the flow, even if it’s 2 seconds. To determine what parts were used the most, wouldn’t it be easier to just look at the completed projects, then count which parts were used in them? It would likely be a close enough approximation without the overhead of the dot system, and might be good for documenting the project anyway. Plus the dot system doesn’t have a lot of granularity or flexibility, and it relies on the categories being static. Let’s say a box of resistors grows so big you want to split it into two subcategories; reallocating the existing dots correctly is now quite difficult. Also, the annoying thing about collecting dusty components is that you won’t need it most of the time… until you do. |
|