|
|
|
|
|
by IFC_LLC
77 days ago
|
|
There are magnitudes of mistakes. I can drop prod 4 times a day on a project that's being used by 4 old grannies to sync their excel file and get away with it. I can get scolded for 5 minutes of downtime at 6 am. There is a point of responsibility in here, and it is up to the management to triage the fallout of this "mistake". |
|