|
|
|
|
|
by Carrok
79 days ago
|
|
> Stanley's system was however an experimental system designed to be proof of concept. It was short lived as the weak points in the system in the system eventually shut the system down (Westinghouse's steam engine was unreliable and the Siemens generator was 'unsatisfactory'). |
|
They had growing pains but it was a grid system.