Hacker News new | ask | show | jobs
by parasubvert 87 days ago
Sure, I was being loose with my terminology, you are right to correct this.

the point was in a 40 hour work week, it's reasonable for 15% of it to spent in coordination meetings, while 85% is directly related to progress.

Usually the retro is after the demo when other folks leave the room / drop from the zoom :-)

1 comments

Not correcting, just clarifying for myself. I sure wish I had such a controlled environment with only 15% of time in coordination and where standup actually was 15 mins and not a segue into the everything meeting.