Did you read the report I put? the pdf, << The Fukushima Daiichi Nuclear Power Plant construction was based on the seismological knowledge of more than 40 years ago. As research continued over the years, researchers repeatedly pointed out the high possibility of tsunami levels reaching beyond the assumptions made at the time of construction, as well as the possibility of reactor core damage in the case of such a tsunami. However, TEPCO downplayed this danger. Their countermeasures were insufficient, with no safety margin.>>
<< By 2006, NISA and TEPCO shared information on the possibility of a station blackout occurring at the Fukushima Daiichi plant should tsunami levels reach the site. They also shared an awareness of the risk of potential reactor core damage from a breakdown of sea water pumps if the magnitude of a tsunami striking the plant turned out to be greater than the assessment made by the Japan Society of Civil Engineers.>>
Even leaving aside they ignored the original placement in order to reduce costs by using biased seismological reports of their convenience, TEPCO knew the plant was at risk, they was warned successively it was at risk. And the supposed regulator NISA [0] closed the eyes conveniently (conveniently for someones). << TEPCO was clearly aware of the danger of an accident. It was pointed out to them many times since 2002 that there was a high possibility that a tsunami would be larger than had been postulated, and that such a tsunami would easily cause core damage.>>
From the other url I put (I updated it with a cached url, I didn't noticed the article was deleted), << there appear to have been deficiencies in tsunami modeling procedures, resulting in an insufficient margin of safety at Fukushima Daiichi. A nuclear power plant built on a slope by the sea must be designed so that it is not damaged as a tsunami runs up the slope.>>
[0] https://en.wikipedia.org/wiki/Nuclear_and_Industrial_Safety_...> the gentlest engineering disaster EU raised the maximum permitted levels of radioactive contamination for imported food following Fukushima, this is not a gentlest gesture to the Europeans. Japanese citizens also received their dose, at time the more vulnerable ones was recruited by the Yakuza to clean up the zone. |
No, I'm just trusting that you'll be honest about what it is saying. I don't need to read a report to persuade myself that a 40 year old plant was designed based on the best available knowledge of 40 years ago. That seems like something of a given. I'm just not sure where you are going with that, it doesn't obviously suggest negligence to me.
You're not saying what tolerances you want them to design to. We both agree that there are scenarios that can and might happen. Obviously is is possible for a tsunami to take out buildings built near the shore in Japan so it doesn't surprise me that people raised it as a risk. A lot of buildings got taken out that day. That doesn't obviously suggest negligence to me; obviously a lot of people were happy living with the risk.
> EU raised the maximum permitted levels of radioactive contamination for imported food following Fukushima
Oh well then. I had no idea. I thought the consequences were minor and now I have learned ... there you go, I suppose. I'm not really sure what to do with this new information.