|
|
|
|
|
by mikestew
89 days ago
|
|
See those big T-shaped things in the picture? Those are the charging stations that BYD (or someone) is going to need to build to see those charging speeds. I'm not saying it can't be done, but as one with an 800V Hyundai that has theoretical charging speed of 350kW, don't expect to just plug in at Electrify America and be done in 5 minutes. (Because the highest I've seen on the Hyundai was 243kW, and I've seen that once, and over 200kW only twice.) But BYD is pushing forward, and though there's some infrastructure to build it'll get there eventually. |
|