|
|
|
|
|
by AlexandrB
112 days ago
|
|
I don't think there's a way to do this without casting something to connect the pre-fab to the surrounding concrete sidewalk. Like how do you precisely cut out the existing curb so the prefab just fits (including elevation/slope) without excessive gaps or something? And if you're pouring concrete anyway, might as well pour the curb itself. |
|