|
|
|
|
|
by bob1029
132 days ago
|
|
Gas plants are only the most expensive in the simple cycle configuration. Combined cycle plants are competitive with other forms of baseload generation. The trouble is the response time. With day ahead forecasting, we can try to turn that peak load into base load. Grid operations are a non trivial part in how this AI energy situation plays out. |
|