|
|
|
|
|
by augusteo
146 days ago
|
|
I used to think this. Then I noticed how often "preparation" became its own infinite loop. At work we built something from a 2-page spec in 4 months. The competing team spent 8 months on architecture docs before writing code. We shipped. They pivoted three times and eventually disbanded. Planning has diminishing returns. The first 20% of planning catches 80% of the problems. Everything after that is usually anxiety dressed up as rigor. The article's right about one thing: doing it badly still counts. Most of what I know came from shipping something embarrassing, then fixing it. |
|
"Preparation" isn't mentioned explicitly, but by my reading it would come firmly under "is not doing the thing".