Hacker News new | ask | show | jobs
by m4rtink 144 days ago
Yeah, the planned Czech high speed trains (VRT) have the same gauge but are expected to be used by the high speed trains almost exclusively, with a limited number of normal-speed passenger trains and AFAIK no cargo traffic at all.