Hacker News new | ask | show | jobs
by someuser54541 148 days ago
Ok, but some extra plumbing (and whatever sorts of engineering studies referred to) and electrical work surely can't as expensive as demolishing and rebuilding a whole building.

These seem like extremely solve-able problems.

2 comments

If it was just the plumbing, then maybe. But its not just the plumbing. Its the plumbing, the electrical, the AC/ventilation, fire codes, and so much more.

Not saying it can't ever be done, it really depends on the building. But its not necessarily a good assumption it can be done well in a cost-effective fashion.

Now watch the video to find out why you’re wrong