|
|
|
|
|
by UltraSane
158 days ago
|
|
French PWRs routinely load-follow, ramping 1-5% of rated power per minute. With ~70% nuclear generation, they had no choice but to design for flexibility. Their N4 and newer reactors can operate between 20-100% power on demand. |
|