Hacker News new | ask | show | jobs
by edent 152 days ago
No. I'm suggesting it is easier and cheaper to retrofit equipment. Not to mention dealing with the extra heat.
1 comments

Pulling the cables down the service shafts from the surface is not the hard part either way.

Stockholm has had 3g in the entire subway system since 2005. Which has then been continuously upgraded. With some very deep lines.