|
|
|
|
|
by tetha
159 days ago
|
|
This however misses an important point: 3 is not in our control. 3 in general is controlled by math-people, and that 3 in particular is probably in the hands of a legal/regulation department. That's a much more important information to highlight. For example, at my last job, we shoved all constants managed by the balancing teams into a static class called BalancingTeam, to make it obvious that these values are not in our control. Tests, if (big-if) written, should revolve around the constants to not be brittle. |
|
However, I’d argue that being 'out of our control' is actually the main reason to test them. We treat these as acceptance tests. The goal isn't flexibility, it is safety. If a PR changes a regulated value, the test failure acts as a tripwire. It forces us to confirm with the PM (and the Jira ticket) that the change is intentional before merging. It catches what code structure alone might miss.